Managing tasks on your own timeline, when some things simply won't wait.
Last week I spent some designing and building an overhead camera rig in order to take some fresh photos of a few concept sketches that I intend to add into my new portfolio once the website finally gets its refresh.
This, I thought, was the last thing I needed in order to set aside half a day and take all the new photos I had planned for the portfolio. Having completed the build and set it up on my desk, I thought I'd mount up my camera with the new-old lens (as in, new to me but secondhand) I bought and try some test photos.
A few shots in, I couldn't figure out why my photos were overexposing so badly. Granted, the new-old lens is a much faster prime lens that the one I'd been using, but the amount of overexposure was crazy. As I'm want to do; like a dog with a bone I spent the rest of the evening trying to diagnose the issue.
It turns out that the aperture blades were, and remain to be, sticky.
I've had the lens for a couple of months and in that time never really used it enough to find out something was wrong. Sure, I had to crank down the exposure compensation a bit which I though was weird, but not enough for me to immediately investigate further. The lens then just sat there, waiting for me to need it.
It wasn't so much that it let me down when I needed it that annoyed me. Nor was it that the two months sitting on my desk was wasted when it could have been out being repaired. It wasn't even the fact that the seller kind of screwed me over with the sale. What really annoyed me was that I thought I had everything I needed ready to go for this photo shoot. Until I didn't.
I'd been waiting until I had my overhead rig built before committing to taking the photos. I didn't really need to, as I'd only intended to take one or two overhead shots to add to the project. But in my mind I'd insisted on waiting until I had everything ready and then knock it all over in one go. I was annoyed because I wanted to have all my ducks in a row before starting.
My ducks never aligned.
There's really two lessons to be learnt here. The first is that one should strike while the iron is hot. The second, is one should get in the habit of chronically overestimating how long something will take.
The Hot Iron
I have a bad habit of not striking while the iron is hot. Unless it is something I'm completely absorbed in, it will usually go into the pile to get to later. My worst recent example is taking six months to collect a gift card from a store. The store was five minutes from my place. The rationale for this was that I would take the time to pick up the gift card and buy the thing I wanted at the same time. As the thing I wanted was not urgent, so too did picking up the gift card become not urgent. When I finally went to pick it up, the store manager (who was very gracious) had told me that he'd had to tell one of his staff not to throw it out. While all ended well, it could have easily not ended well simply because it was so low on my to-do list.
I get it. There's always a delta between what we need to do and what we want to do. Of course, some people just roll with this. Mark Forster calls this (ironically) the Autofocus method. Rather than having categories, due dates, and priorities, you simply create one big list. Then you just pick off each item as you feel like doing it.
This is generally how I operate as much as I can. As a creative I think it's important to do the thing you're drawn, or inspired, to do when you're drawn to it. This style of process is far more conducive to quality creative work than sitting down and trying to squeeze out some idea because you're scheduled to do so.
One of the underlying drivers of the system, which I can kind of agree with, is that if you leave something long enough because you don't want to do it or have something you want to do more, eventually its urgency increases. Once it crosses this threshold, you're compelled to complete the task of your own volition. One of the problems I've found with this, however, is that by the time a task becomes important enough to do, it's also embarrassingly late by most other people's metrics. The risk then is that the task has tipped over entirely into 'too late'.
This is usually only an issue when there are external factors involved; like a store holding a gift card for you. You can't assume these factors will wait until you're ready. One way to reconcile the desire to work on what you want to work on, while being mindful of external factors that don't care about your priorities, would be to internalise those factors.
In the gift card example, if I'd picked up the card earlier then I would have internalised that timeline and could have gone back to pick up the goods at any other time of my choosing. In my above lens example, I could have saved myself several weeks if I'd internalised the knowledge of the faulty lens. By finding out the lens was faulty, this would have informed my priority list. I would have then taken appropriate action accordingly.
You'll note in both examples that I held off on doing each task because I was attempting to bundle multiple tasks together. Ironically, this goes against the Autofocus method. The Autofocus method promotes breaking big tasks up into small tasks, done frequently. I was trying to take small tasks, and make them larger compound tasks. While I don't think this is inherently bad, sometimes bundling tasks that fit a particular mindset can be more conducive to creative work and cultivating a flow state.
Just as there's no perfect productivity system (is "productivity" a swear word now?), there's no perfect way to bundle tasks to suit your own flow and focus priorities while simultaneously managing external factors that won't wait for you. The best I've come up with is being diligent in internalising those factors as soon as practical to do so, then sitting on them until you are compelled to do them.
Overestimate The Time It Takes
This goes hand-in-hand with how long things take. If you're not internalising the knowledge and timelines, then those things remain in someone or something else's control.
While I have no control over how long a camera lens takes to repair, by first knowing it needs repair and then knowing how long it takes to repair, I can manage that timeline accordingly. Short of literally internalising every task and micromanaging the whole project, equipping yourself with knowledge of the tasks required and the time those tasks will take is the far more desirable option. Doing this as early as possible, even if the tasks are done at your leisure much later, always leads to better outcomes.
This is one of the reasons I encourage students and startup founders to lift the biggest rock first. The biggest challenge with the greatest unknowns will also provide us with the most answers once solved. We're internalising knowledge that is unknown until we design, build, and test. This then empowers us to make choices on our own terms. As we iterate, we internalise more information that permits us to make better decisions and ultimately better designs.
There is always risk that those timelines blow out of course, but alas, there is only so much within one's power. This is doubly true in R&D-heavy activities. I heard recently that estimated timelines should always have another 50% added on top to be more accurate. I think that's far too generous. In my experience, whatever timeline you estimate, double it.
Yes, that even goes for when you [think you] know everything there is to know.
